MEKAWIRE
专业arXiv

Preemptive Instruction Following with Resumption

Zerun Liu, Lechao Cheng, Yimin Liu, Shengeng Tang, Yaxiong Wang, Zhun Zhong
暂无中文版,显示英文原文。
摘自论文摘要

Long-horizon embodied navigation may be interrupted by a higher-priority instruction before the current task sequence is complete. The agent must finish its current atomic task, execute the inserted task, and resume the remaining sequence from the updated environment state, where its viewpoint and available navigation candidates may have changed.

摘自论文摘要,摘要生成中。

论文全文

本文依据 CC BY 4.0 许可发布,全文经署名以英文转载:阅读全文(英文)。原文见 arXiv:2610.35576(PDF)。