MEKAWIRE
ExpertarXiv

Scaling VLA Serving Under Robotic Execution Constraints

Yue Zhang, Zicong Ye, Lufang Chen, Dance Yang, Mingyang Li, Zhenwei Duan, Michael Zhao, Ziye Deng, Starrick Liu, Ruizhi Chengze, YongHua Chen, SongAo Han, Yu Sun, Ran Yu, Xiaofan Li, Ruyi Gan, Hao Wang
From the abstract

Vision-language-action (VLA) models have emerged as a promising paradigm for general-purpose robotic manipulation. In our production setting, hundreds of VLA-powered robots are already operating in real-world environments, creating an immediate need for efficient fleet serving.

From the abstract. Our summary is in progress.

Full paper

Scaling VLA Serving Under Robotic Execution Constraints

Yue Zhang, Zicong Ye, Lufang Chen, Dance Yang, Mingyang Li, Zhenwei Duan, Michael Zhao, Ziye Deng, Starrick Liu, Ruizhi Chengze, YongHua Chen, SongAo Han, Yu Sun, Ran Yu, Xiaofan Li, Ruyi Gan, Hao Wang

Published under CC BY 4.0. Reproduced with attribution; original at arXiv:2611.14969 (PDF).

marginparsep has been altered. topmargin has been altered. marginparwidth has been altered. marginparpush has been altered.

The page layout violates the ICML style.

Please do not change the page layout, or include packages like geometry, savetrees, or fullpage, which change it for you.

We’re not able to reliably undo arbitrary changes to the style. Please remove the offending package(s), or layout-changing commands and try again.

Scaling VLA Serving Under Robotic Execution Constraints

X Square Robot Team

Figure 1: Production parcel handling. A carton (top) and a soft parcel (bottom) are reoriented and pushed onto the conveyor. Each row follows the same parcel from left to right.

Abstract

Vision-language-action (VLA) models have emerged as a promising paradigm for general-purpose robotic manipulation. In our production setting, hundreds of VLA-powered robots are already operating in real-world environments, creating an immediate need for efficient fleet serving. We present XInfer, a production-deployed VLA serving system designed to reduce the inference infrastructure cost of large-scale robotic deployments. XInfer jointly coordinates heterogeneous VLA computation with the evolving response requirements of robotic execution. By exploiting computational parallelism while managing interference, XInfer improves GPU efficiency while protecting time-critical robotic feedback. We evaluate XInfer across three VLA models using production-derived workloads, achieving 1.26–3.75× the effective robot capacity (ERC) of state-of-the-art systems under physical-execution constraints. Our implementation is publicly available at https://github.com/X-Square-Robot/xinfer.

1 Introduction

Vision-language-action (VLA) models are bringing general-purpose robotic manipulation into logistics and manufacturing, where multiple robots can share GPU infrastructure to reduce serving cost. Figure id1 shows representative parcel-handling operations from our production deployment. Recent inference engines improve the efficiency of individual VLA queries (Su, 2026; Xu et al., 2026; Tan et al., 2025). However, higher inference throughput does not necessarily translate into greater physical productivity, as delayed feedback can disrupt robotic execution. We use effective robot capacity (ERC), the maximum number of concurrent robots a GPU can serve while meeting specified latency and reliability requirements, as the serving objective.

Figure 2: Projected parcel throughput on one GPU (VLA-2B), combining measured latency with single-robot trials. Guides mark 13k parcels/h; ERC requires response P50 <150\,\mathrm{ms}{} and zero request errors. Shading reflects trial variation; dashed curves and hatching mark extrapolation.

Shared VLA serving requires exploiting concurrency without compromising time-critical feedback. VLA requests traverse heterogeneous stages with distinct computational demands, creating opportunities to overlap independent work across robots. However, concurrent GPU execution also introduces interference: admitting a new stage may delay stages already in progress. Since these stages are non-preemptive, prioritizing urgent requests alone cannot prevent deadline violations caused by previously admitted work. Effective fleet serving therefore requires two coordinated decisions: which requests should be prioritized, and which stages can be admitted without jeopardizing the deadlines of current and forthcoming requests.

The cost of this interference is not uniform across requests. Robots continue executing previously predicted actions while awaiting new responses, and the consequences of delayed feedback depend on their ongoing physical execution. As a result, requests with similar computational demands may have substantially different response-time requirements, which evolve throughout task execution. Moreover, response timing influences subsequent request arrivals, coupling scheduling decisions with future workload dynamics. Fleet serving must therefore balance concurrency against interference under changing per-request deadlines, rather than optimize inference throughput or average latency alone.

Prior systems adapt action horizons and request priorities to execution context (Dai et al., 2026; Anonymous Authors, n.d.), coordinate serving for factory productivity (Jiang et al., 2026), or overlap encoding and diffusion in lockstep rounds (Adamopoulos et al., 2026). Yet effective fleet serving must reconcile the time-varying urgency of robotic feedback with the distinct computational demands of VLA stages. This calls for fine-grained scheduling that matches stage execution to available GPU capacity while controlling interference with time-critical requests.

We present XInfer, a VLA serving system that couples asynchronous execution with fine-grained, execution-aware scheduling. Its dependency-driven engine exposes parallelism across requests and heterogeneous VLA stages, allowing computation to progress as dependencies resolve. The scheduler coordinates these execution opportunities with the time-varying urgency of robotic feedback by decoupling request prioritization from stage admission. At stage boundaries, it combines per-request response-time budgets, remaining computation, and predicted interference to admit ordinary work only when protected requests remain predicted feasible. It further accounts for anticipated earlier-deadline arrivals using request history, balancing immediate concurrency gains against future scheduling demands.

We evaluate VLA-2B, \pi_{0.5}, and Wall-OSS-0.5 using production-derived closed-loop workloads and controlled experiments. With error-free responses, XInfer achieves ERCs of 18 VLA-2B and 24 \pi_{0.5} robots, versus 10 and 15 for vLLM-Omni; Robion serves 19 \pi_{0.5} robots. In a separate VLA-2B evaluation with heterogeneous response-time budgets, all policies share the same backend and execution resources. Under the same real-time feasibility criterion, XInfer achieves an ERC of 18 robots, compared with 15 for Slack-Gate, 14 for FIFO, and 12 for EDF (§6). Mechanism ablations isolate the effects of asynchronous execution and scheduling decisions.

Our contributions are:

  • An asynchronous VLA serving engine that exposes cross-request and cross-stage parallelism by advancing work as its dependencies complete.
  • Execution-aware cross-stage scheduling that coordinates shared GPU computation by separating request priority from stage admission, accounting for interference on current and anticipated urgent requests.
  • Production deployment and empirical evaluation. XInfer is deployed in production. We characterize closed-loop workloads, compare ERC across three VLA backends, and evaluate heterogeneous-budget scheduling and its mechanisms.

2 Background

Figure 3: VLA computation and real-time chunking. (a) Conditioning keys and values are reused across denoising steps. (b) The frozen prefix aligns the next chunk with committed actions while inference overlaps execution. The illustrated early response satisfies L<d\Delta<T_{E}, so the next send occurs at t_{k}+T_{E}.

2.1 Heterogeneous VLA Computation

Vision-language-action (VLA) models map observations and instructions to robot actions. We study models coupling a vision-language backbone to an action expert that generates continuous actions through flow matching or diffusion (Lipman et al., 2023; Chi et al., 2023; Black et al., 2025a; Yu et al., 2026; Zhai et al., 2025). As Figure 3(a) shows, the backbone computes conditioning keys and values once; the expert reuses them over K denoising steps to generate an action chunk of H future keyframes (Zhao et al., 2023). We distinguish three computational stages: ViT encodes visual observations, Prefill performs language-model computation after visual encoding, and Action generates actions through denoising. These stages differ in computation and memory-access patterns. The expert’s weights differ from the backbone’s, and its evolving action state is private to each request.

2.2 Closed-Loop Robot Control

Real-time chunking (RTC) (Black et al., 2025b) aligns independently generated chunks by freezing the next chunk’s first d keyframes to committed actions (Figure 3(b)). For a request issued at t_{k} with keyframe spacing \Delta, the planned handoff is t_{k}+d\Delta and its budget is d\Delta. A late chunk can cause an action discontinuity if applied without alignment to current execution progress. If the action queue empties, our controller pauses execution until a replacement chunk becomes usable.

Longer commitment permits more inference time but postpones feedback, even when d adapts to recent latency (§3.1). Appendix B.1 gives the inpainting and handoff details.

2.3 Fleet Workload and Request Contract

A fleet shares inference resources across robots, each running its own control loop. A request carries observations, robot state, and model inputs. Each request j is associated with a response-time budget b_{j} that expresses its feedback requirement. The budget is supplied as request metadata and may be assigned by the robot controller, a task planner, or a policy at the serving frontend. RTC requests additionally supply the aligned previous action chunk and commitment length d. The response budget, RTC handoff budget d\Delta, and minimum request period T_{E} are distinct quantities: they specify the serving requirement, the planned chunk handoff, and the earliest next send.

Robots continue their current chunks while requests are processed. We use a minimum-period request policy with at most one outstanding request per robot. Let s_{j} be the actual send time of request j and r_{j} its response arrival time. Abstracting local client-side handling, the next request is sent at

s_{j+1}=\max(s_{j}+T_{E},r_{j}).
(1)

The next send occurs when the minimum interval has elapsed and the previous response has arrived. Thus, N robots offer at most N/T_{E} requests per unit time; late responses reduce both offered load and action-update frequency.

Figure 4: Five separately recorded request streams aligned on a common 2-s axis. Top: bars mark requests in flight and ticks mark sends. Bottom: the superimposed in-flight count.

Figure 4 overlays five streams from deployed robots, including two sessions from one robot. Requests occupy only 45–53% of each dedicated instance’s timeline; combined arrivals show gaps and bursts.

Objective and service metrics.

We use effective robot capacity (ERC), denoted N^{*}, to measure the maximum number of concurrent robots a GPU can serve while meeting specified latency and reliability requirements. Each comparison fixes the model, workload, and acceptance criterion. Response latency measures feedback delay. SLO attainment is the fraction of responses meeting their supplied budgets; on-time goodput counts such responses per unit time. Section 6.1 specifies the acceptance criteria and measurement windows for each experiment.

3 Motivation

Sharing GPU capacity across independent robots must preserve timely feedback. The workload in Section 2 motivates three requirements: express changing feedback needs, expose independent work, and control concurrent interference.

3.1 Feedback Needs Change During Execution

In our delay-injection study, adding 200\,\mathrm{ms} before action delivery reduces completed parcel output by 29.6%. Separate fixed-count studies observe additional attempts for parcel reorientation and conveyor pushing, both contact operations. These results connect delayed feedback to reduced physical progress; Appendix A gives the protocols and results.

Acceptable delay varies during execution. Contact operations, such as grasping, parcel flipping, and conveyor pushing, or interaction with a changing scene may require frequent updates. Predictable free-space transport may tolerate a longer execution horizon. Increasing the RTC commitment length buys response time but postpones feedback; it cannot replace timely service when rapid adaptation is needed. A fixed priority per robot cannot capture these changes.

These observations call for per-request feedback requirements. Planned motion, execution progress, and application-specific signals, such as gripper events or contact observations, provide cues about how quickly feedback is needed. A budget-selection policy can map this execution context to a response-time budget for each request. The contract in Section 2.3 exposes these budgets to the scheduler through a uniform interface.

Closed-loop throughput and goodput.

By Equation 1, robot i’s kth response latency L_{i,k} determines send interval \tau_{i,k}=\max(T_{E},L_{i,k}). Over robot i’s requests, define mean cycle overrun h_{i}=\mathbb{E}[(L_{i}-T_{E})^{+}] and attainment p_{i}=\Pr(L_{i}\leq b_{i}), where b_{i} is the request’s budget and (x)^{+}=\max(x,0). For N continuously active robots with stationary, ergodic request sequences and finite mean latency, long-run throughput X and on-time goodput J satisfy

X=\sum_{i=1}^{N}\frac{1}{T_{E}+h_{i}},\qquad J=\sum_{i=1}^{N}\frac{p_{i}}{T_{E}+h_{i}}.
(2)

These long-run rates follow from one response per mean cycle T_{E}+h_{i}, with fraction p_{i} on time. Delaying wide-budget requests can lengthen request cycles even when responses remain on time. Higher attainment can therefore coexist with lower goodput; scheduling must preserve update frequency as well as deadline attainment. Section 6.3 evaluates both effects.

3.2 Independent Requests Offer Parallelism

The streams in Figure 4 leave gaps in each dedicated instance yet produce bursts when combined. Sharing can fill these gaps by coordinating independent work. Each request follows ViT, Prefill, and Action dependencies, but CPU preparation can overlap GPU execution, and another request’s ViT or Prefill can progress during Action. Serializing complete requests or advancing stages in common rounds introduces waits that these dependencies do not require.

At 24 robots, enabling the full execution engine on \pi_{0.5} raises throughput from 54.90 to 131.53 req/s (2.40\times, Figure 9). These results motivate exposing work as its dependencies complete.

3.3 Throughput Alone Does Not Protect Deadlines

Throughput gains need not improve tail latency. In a separate 32-robot \pi_{0.5} ablation, adding independent progression to multi-stream execution raises QPS by 9.7%, but P99 rises from 467.07 to 560.28\,\mathrm{ms} (Table 6).

A wide-budget request’s Prefill can consume GPU resources needed by a tight-budget Action. Deadline ordering (Liu and Layland, 1973) chooses which queued request runs next, but moving the urgent request to the front does not release resources held by non-preemptive work. Urgency must account for remaining computation and interference, and starting another stage must depend on its effect on that work.

Protecting only requests already present can also be too late: a long-running stage may still be active when an earlier-deadline request arrives. In matched experiments with alternating task phases, arrival-aware admission raises mean SLO attainment by 5.0 and 11.3 percentage points at 16 and 18 robots, respectively (Table 8). Conversely, holding all other work whenever a request becomes urgent can forgo useful overlap.

The scheduler must therefore separate request protection from stage admission. Admission should permit useful overlap while keeping the deadlines of current and anticipated urgent requests predicted feasible. Urgency alone should not stop all other work.

4 Design

XInfer separates the availability of parallel work from the decision to execute it. An asynchronous engine makes work ready as its dependencies complete. A central scheduler identifies requests that need protection, then admits ordinary work only when the resulting interference preserves predicted deadline feasibility. This division addresses the tension in Section 3: exploiting parallelism without delaying urgent action updates.

4.1 System Overview

The server consumes per-request response-time budgets and RTC inputs through the request contract in Section 2.3. Budget assignment and execution-horizon selection are separate from the scheduler’s request prioritization and stage admission.

Figure 5(a) shows the ViT, Prefill, and Action pipeline, preceded by CPU preparation and followed by output processing. The engine maintains dependencies, ready queues, and bounded execution resources; the central scheduler controls admission at each stage entry. Solid arrows carry data, dashed arrows convey admission decisions, and dotted arrows return scheduler state.

The policy makes two decisions: which requests need protection (§4.3) and which ready stages may start (§4.4). Both use request progress and shared resource state; the latter also considers arrival history. Issued GPU units are non-preemptive. Section 5 specifies each backend’s execution boundaries.

In Figure 5(b), A has an urgent Action, B a ready Prefill, and C additional vision work; D is preceding ordinary work.

Figure 5: XInfer architecture and illustrative execution. (a) Central scheduling controls admission at the ViT, Prefill, and Action entries. (b) Admission permits concurrent work when A’s response is predicted to meet its deadline.

4.2 Asynchronous Stage Execution

Advance work by its dependencies.

Each request follows ViT, Prefill, and Action dependencies without a common round barrier. Once Prefill supplies its conditioning state, Action can run alongside another request’s ViT or Prefill. CPU preparation and output processing can overlap GPU work from other requests. Admission controls interference before additional GPU work starts.

Separate submission paths.

ViT and Prefill share a process; Action runs in another, with independent host submission loops and private execution state. This avoids serializing their host work through one submission loop. CUDA streams support concurrency within the ViT/Prefill process; MPS (NVIDIA, 2026) permits the processes to execute concurrently on the shared GPU. Requests reuse read-only weights and retain private intermediate state. Bounded state slots propagate backpressure when a downstream stage cannot accept work.

Dispatch admitted work.

The engine dispatches admitted work at backend-supported execution boundaries. Each execution unit advances on its own completion events, without a common round barrier, and runs to completion. Request state remains private. Section 5 maps computational stages to execution units and specifies their dispatch boundaries.

Figure 6: Scheduling decisions (illustrative predictions). (a) Protect A using remaining slack. (b) Refresh shared slack after each launch. (c) Defer w for an earlier-deadline forecast. Panel (b) fixes t and H=\{A\}, with additive costs and other checks passing. Dashed outlines mark forecasts; hatching marks excess cost in (b) and extra delay in (c).

4.3 Request Prioritization

The scheduler protects queued and running requests according to their remaining slack and the work that could delay them.

Progress-aware service-time estimation.

At server arrival a_{j}, request j with budget b_{j} receives scheduling deadline \ell_{j}=a_{j}+b_{j}-\delta, where \delta reserves estimated time outside the server. Given projected concurrent stage counts \mathbf{n}, a calibrated model R_{j}(\mathbf{n}) estimates remaining service time, covering the current stage’s residual, subsequent stages, and output processing, excluding future queueing. At time t, the slack available for waiting and additional interference is

\sigma_{j}(\mathbf{n})=\ell_{j}-t-R_{j}(\mathbf{n}).
(3)

The predictor tracks each running stage’s progress by accumulating calibrated execution rates as concurrency changes, and refreshes R_{j} at each decision. Appendix C.1 specifies the model and calibration; Appendix C.2 evaluates remaining-time prediction for running stages.

Blocking-aware promotion.

Following non-preemptive response-time analysis (Audsley et al., 1993; Jeffay et al., 1991), let B_{j} be the maximum predicted remaining time of another request’s running ordinary unit, or zero if none exists. When \sigma_{j}<B_{j}, waiting for that unit could exhaust j’s slack, so the scheduler promotes j. In Figure 6(a), A is promoted because its 10\,\mathrm{ms} slack is below B_{A}=14\,\mathrm{ms}. Promotion persists while the request is live. Effective protection is withheld while the request is predicted late even in isolation; it remains eligible for service and can regain protection if the prediction changes.

RefreshPriority returns the effective protected set H, including queued and running requests, and foreseeable load \mathbf{n}_{f}: running units plus protected ready work that available resources can issue. Ready requests are ordered by protected status and then deadline.

4.4 SLO-Aware Admission

Protected work starts when resources permit; ordinary candidates must pass current-request and forecast checks to limit interference on urgent work. This adapts slack stealing (Lehoczky and Ramos-Thuel, 1992) to concurrent GPU stages, using parallel capacity when the affected deadlines remain predicted feasible.

Current-request protection.

Consider an ordinary candidate unit u at stage s, not yet included in foreseeable load \mathbf{n}_{f}. At a fixed decision time, let \mathbf{n}^{+}=\mathbf{n}_{f}+\mathbf{e}_{s} add that unit. Its predicted interference on protected request h and the resulting slack satisfy

\begin{split}\Delta_{h}(u)&=R_{h}(\mathbf{n}^{+})-R_{h}(\mathbf{n}_{f}),\\
\sigma_{h}(\mathbf{n}^{+})&=\sigma_{h}(\mathbf{n}_{f})-\Delta_{h}(u).\end{split}
(4)

CurrentFeasible accepts exactly when \Delta_{h}(u)\leq\sigma_{h}(\mathbf{n}_{f}) for every h\in H.

Local property. A passing candidate leaves the current protected set predicted feasible under this decision’s snapshot. Proof. The inequality gives \sigma_{h}(\mathbf{n}^{+})\geq 0, hence t+R_{h}(\mathbf{n}^{+})\leq\ell_{h} for every h\in H.

A failed check leaves the candidate queued while other ready work is considered.

Coordinate decisions across stages.

Arrivals, completions, and periodic ticks trigger Algorithm 1. The driver visits Action, Prefill, and ViT. ScanReady starts from priority-ordered ready work and yields candidates while the stage has capacity, retaining deferred work for later scans. Each launch updates shared execution state and refreshes protection before the next check. Figure 6(b) shows why: under the illustrative additive predictor, admitting u consumes 6\,\mathrm{ms} of A’s 10\,\mathrm{ms} slack, leaving 4\,\mathrm{ms}. Candidate v would add another 6\,\mathrm{ms} and is deferred. Independent checks against the original snapshot would admit both. Appendix C.1 specifies the priority update and stage iteration rules.

Arrival-aware admission.

In Figure 6(c), w passes the current-request check but would delay forecast request e past its earlier deadline. ForecastFeasible uses recent arrivals grouped by response budget to forecast requests during the candidate’s execution, retaining those whose deadlines precede the candidate’s. Each retained forecast must satisfy \delta+f+R_{V}(\mathbf{n}^{\prime}_{e})\leq b_{e}, where f reserves front-end time, R_{V} estimates the remaining pipeline from ViT, and \mathbf{n}^{\prime}_{e} includes the candidate and preceding retained forecasts.

Algorithm 1 SLO-aware stage dispatch

5 Implementation

Model adapters connect input preparation, kernels, CUDA graphs, and output processing to the runtime. VLA-2B and Wall-OSS-0.5 use MXFP8 ViT/Prefill linear operations (Rouhani et al., 2023) and BF16 Action; \pi_{0.5} uses native FlashRT FP8 with explicit state-text conditioning (Appendix B.1). The central scheduler dispatches each stage separately; the three-model backends combine ViT and Prefill as Context. Each Action dispatch runs a complete, non-preemptive denoising trajectory with fixed request membership; central Action dispatches contain one request. Client timestamps measure response latency; server timers and event traces diagnose execution. Runtime controls toggle GPU-stage overlap, cohort barriers, and CPU–GPU overlap (Section 6.4). Appendix C.1 records the central predictor’s calibration and constants.

6 Evaluation

6.1 Experimental Setup

Models and serving comparisons.

Each serving run uses NVIDIA consumer-grade Blackwell GPUs. The three-model study covers VLA-2B, Wall-OSS-0.5, and \pi_{0.5}. VLA-2B uses a Qwen3.5-2B backbone and non-public weights. We use requests representative of our deployment setting and keep inputs fixed across serving methods within each model. Each request contains three camera views, a shared language instruction, and a 14-dimensional synthetic robot state. Table 1 summarizes the input shapes and actual prefix lengths. All models encode 868 image patches into 217 visual tokens; text lengths reflect their native tokenizers and templates. Appendix B.1 details input preprocessing. For each model, we compare XInfer with integrations of SGLang (Zheng et al., 2024) and vLLM-Omni (Yin et al., 2026), FlashRT (served through its Nexus frontend) (Su, 2026), and a Robion single-GPU reimplementation (Adamopoulos et al., 2026). The latter combines true stage batches, lockstep progression, and calibrated Context SM quotas; Context group g overlaps Action group g-1, with a barrier between rounds. Comparisons share the checkpoint, workload, precision, and compute backend. Appendix B.3 lists the Robion reproduction settings; Appendix B.1 provides the measurement protocol.

Table 1: Input configuration. Token segments sum to the full prefix; action tokens and sequence padding are excluded.
  • Camera 1 (pixels)
    VLA-2B
    224\!\times\!352
    Wall-OSS-0.5
    196\!\times\!308
    \pi_{0.5}
    196\!\times\!308
  • Cameras 2/3 (pixels)
    VLA-2B
    224\!\times\!320
    Wall-OSS-0.5
    196\!\times\!280
    \pi_{0.5}
    196\!\times\!280
  • Patch size (pixels)
    VLA-2B
    16\!\times\!16
    Wall-OSS-0.5
    14\!\times\!14
    \pi_{0.5}
    14\!\times\!14
  • Visual tokens
    VLA-2B
    217
    Wall-OSS-0.5
    217
    \pi_{0.5}
    217
  • Instruction tokens
    VLA-2B
    41
    Wall-OSS-0.5
    41
    \pi_{0.5}
    40
  • State tokens
    VLA-2B
    72
    Wall-OSS-0.5
    74
    \pi_{0.5}
    127
  • Template/special tokens
    VLA-2B
    116
    Wall-OSS-0.5
    113
    \pi_{0.5}
    11
  • Full prefix
    VLA-2B
    446
    Wall-OSS-0.5
    445
    \pi_{0.5}
    395
Figure 7: Serving performance across three models. Latency uses a log scale; dashed lines mark 150\,\mathrm{ms}. Large markers and guides identify confirmed ERCs for XInfer and Robion.
Central-scheduling comparison.

All SLO policies share the three-stage VLA-2B backend, model, kernels, and allocated GPU resources. FIFO orders ready requests by arrival. EDF orders each stage queue by deadline with fixed per-stage concurrency limits. Slack-Gate uses deadline queues and defers non-urgent work when another request has less than 40\,\mathrm{ms} estimated slack. Appendix C.4 details baseline configurations and parameter selection. Policy-specific bounds and admission decisions determine actual concurrency. XInfer applies the same prediction and admission rules across workloads. Matched policy comparisons use the same GPU.

Load and metrics.

Each emulated robot follows a closed-loop request stream with at most one request in flight and a minimum send interval of 180\,\mathrm{ms} (Equation 1). Response latency spans sending a packed request to receiving the complete response; capture, packing, and parsing are excluded. The three-model runs use ten denoising steps and 16 future action points. The RTC commitment length is fixed at d=8 in both studies; response-time budgets in the central-scheduling replay follow each workload. Both serving studies measure requests over 180 s after 30 s of warmup. We report ERC as the largest validated integer robot population. The three-model comparison requires zero request errors and response P50 below 150\,\mathrm{ms} in all three windows; the central-scheduling study requires at least 95% SLO attainment. Three-model QPS counts successful requests sent and completed within the window; central-scheduling goodput counts on-time responses to requests sent within it. Both rates divide these counts by 180 s. Appendix B.1 details aggregation and measurement-window boundaries; Appendices B.2 and C.4 detail ERC validation.

ERC criteria and physical task throughput.

We apply the deployment-derived 150\,\mathrm{ms} threshold across models: 50\,\mathrm{ms} baseline response plus 100\,\mathrm{ms} injected delay, near the delay–throughput knee (Appendix A.1). For heterogeneous budgets, the 95% attainment target defines a common high-attainment operating point allowing at most 5% deadline misses; goodput captures the accompanying response-rate tradeoff. Figure 2 projects fleet parcel throughput from measured serving latency and physical calibration (Appendix A.1).

Table 2: ERC (robots) under the response-latency criterion.
  • XInfer
    VLA-2B
    18
    Wall-OSS-0.5
    15
    \pi_{0.5}
    24
  • SGLang
    VLA-2B
    10
    Wall-OSS-0.5
    5
    \pi_{0.5}
    14
  • vLLM-Omni
    VLA-2B
    10
    Wall-OSS-0.5
    8
    \pi_{0.5}
    15
  • FlashRT
    VLA-2B
    5
    Wall-OSS-0.5
    4
    \pi_{0.5}
    9
  • Robion
    VLA-2B
    11
    Wall-OSS-0.5
    10
    \pi_{0.5}
    19
Figure 8: Four workloads with matched resources: (a–c) show three metrics for alternating phases; (d–f) show attainment for the other workloads. Curves show means with min–max whiskers. Large markers denote ERC in (a) and 33% lower mean latency for XInfer versus Slack-Gate at 15 robots in (b). Shading in (d) marks added robots’ measured active periods.

6.2 Serving-System Comparison

XInfer achieves ERCs of 18, 15, and 24 robots across the three models, exceeding all compared systems (Table 2). Compared with Robion’s 11, 10, and 19 robots, these ERC values are 63.6%, 50%, and 26.3% higher.

For each model, all five systems are evaluated at the same robot counts. At low load, throughput follows the aggregate request rate; after saturation, responses delay subsequent sends and latency rises sharply (Figure 7). Appendix B.2 details ERC validation.

These complete-system comparisons combine multiple mechanisms; Section 6.4 separates their contributions within a common runtime.

6.3 Serving Heterogeneous SLOs

Alternating task phases.

In our block-stacking tasks, alignment and contact are more sensitive to delayed feedback than transport. Motivated by this observation and the recorded phase patterns (Appendix C.3), we alternate each robot’s response budget between 90 and 400\,\mathrm{ms} every 30 completed requests, with staggered robot phases and the closed-loop trigger in Equation 1. We report SLO attainment, on-time goodput, and mean wide-budget response latency.

XInfer achieves an ERC of 18 robots under the 95% SLO criterion, compared with 15 for Slack-Gate, 14 for FIFO, and 12 for EDF (Figure 8). EDF degrades gracefully under overload: it keeps 88.6–90.8% attainment from 16 to 20 robots, where FIFO falls to about 50%, and exceeds Slack-Gate at 20 robots (88.6 versus 75.9%). Appendix C.4 gives detailed results. At 15 robots, both XInfer and Slack-Gate satisfy the 95% overall SLO target. XInfer reduces mean wide-budget latency by 33% and increases goodput from 69.3 to 80.2 responses/s. The closed-loop relation in Equation 2 explains how shorter request cycles can increase goodput alongside improved attainment.

Bursty robot arrivals.

To test transient overload, we start with 12 robots and add six robots with 90\,\mathrm{ms} budgets at 60 s and again at 120 s, each issuing 55 requests. Figure 8(d) shows the resulting attainment over time. Within the designated 60–80 s and 120–140 s windows, XInfer attains 96.6%, versus 95.9% for EDF and 85.1% for Slack-Gate.

Multiple response budgets.

To broaden the budget distribution, 15 robots cycle through 80, 120, 160, 250, and 400\,\mathrm{ms} budgets every 30 responses, with staggered phases. XInfer attains 96.1% overall versus 95.1% for EDF and 92.5% for Slack-Gate, with the per-budget breakdown in Figure 8(e). Appendix C.4 reports per-round results and aggregation details.

Parcel handling.

The parcel-handling workload derives response-indexed budget sequences from gripper events in 23 episodes recorded in production. Sequences advance with successful responses, yielding 61–63% tight requests and intervals in which all robots carry tight budgets (Appendix C.5). Under the 95% SLO criterion, XInfer achieves an ERC of 14 robots, versus 12 for Slack-Gate and 10 for FIFO. EDF has no confirmed ERC within the tested range of 10–20 robots (Figure 8(f)). From 16 to 20 robots, observed SLO attainment gains for XInfer over Slack-Gate span 3.8–11.4 percentage points, while wide-budget responses return 7–39\,\mathrm{ms} sooner.

6.4 Execution Engine Ablations

Figure 9: Cumulative ablation on \pi_{0.5} at 24 robots. Bars show per-window means, rows retain prior mechanisms, and arrows show incremental gains. Execution-aware concurrency enables intra-stage concurrency. Cross-stage coordination combines Context–Action overlap and independent progression. Full engine: 2.40\times throughput and 3.06\times P50 speedup over All-Off.

CPU–GPU overlap in Figure 9 permits host work during GPU execution, but retains serial GPU execution. Execution-aware concurrency enables the selected intra-stage multi-stream mode, raising throughput from 59.52 to 104.23 req/s (1.75\times). Cross-stage coordination then combines Context–Action overlap with independent progression, reaching 131.53 req/s (1.26\times) and reducing P50 from 229.45 to 142.35\,\mathrm{ms} (1.61\times speedup). These increments depend on the enable order.

Closed-loop triggering limits throughput headroom. The 180\,\mathrm{ms} minimum send interval caps 24 robots at 24/0.18\approx 133.33 req/s, only 27.9% above the penultimate configuration. The full engine reaches 131.53 req/s. Responses arriving before the next eligible trigger cannot advance the next request (Equation 1), so latency reductions need not yield proportional QPS gains. Appendix B.4 details the controls and protocol.

6.5 Scheduler Analysis

Figure 10: Scheduler ablations. Mean SLO attainment drop relative to full XInfer for each scheduler variant. Appendix C.3 gives workload settings.
Policy controls and component ablations.

Figure 10 compares four controls with full XInfer. Removing interference modeling replaces concurrent-stage predictions with isolated durations, lowering mean attainment by 45.5 and 51.4 percentage points for alternating phases and parcel handling at 18 robots. Strict priority gating blocks ordinary work whenever a protected request exists, reducing attainment by 7.5–30.5 points across eight settings. Arrival-aware and stage-wise admission primarily protect tight-budget requests: disabling arrival-aware checks or checking only before ViT weakens this protection as load approaches saturation. The losses grow with the tight-budget share and concentrate within bursts; strict gating instead starves ordinary work. Appendix C.3 reports workload-level results and the latency and goodput effects of arrival-aware admission.

Running-stage prediction.

Causal replay of recorded stage transitions at 8/18/20 robots uses only the concurrency history available at each sample. Mean absolute errors for the remaining execution time of running stages are 2.0/2.6/2.8\,\mathrm{ms}. Appendix C.2 details the measurement protocol and remaining-time error distributions.

Scheduling overhead.

In chronological CPU replay, a policy update followed by an admission check takes 73/77 \mus at P99 with 15/18 robots, below 0.1% of the 90\,\mathrm{ms} response budget. This measures CPU policy time, not added response latency; GPU execution proceeds asynchronously. Appendix C.3 gives the replay protocol.

7 Related Work

Robot and VLA serving.

Prior robot-serving systems use execution context to guide scheduling: Kairos adapts execution horizons, Armory uses action-queue state, and ROSA coordinates placement, batching, and request rates (Dai et al., 2026; Anonymous Authors, n.d.; Jiang et al., 2026). Robion overlaps encoding and action diffusion with fixed stage batches and lockstep progression, and selects model queues by their head requests’ SLOs (Adamopoulos et al., 2026). XInfer also exploits stage overlap, but advances requests independently and separates request priority from interference-aware stage admission.

Stage-aware inference.

Iteration-level scheduling and chunked prefill improve LLM serving (Yu et al., 2022; Agrawal et al., 2024), while DistServe, Splitwise, and semi-PD separate prefill and decoding resources (Zhong et al., 2024; Patel et al., 2024; Hong et al., 2025a). In VLA serving, encoding and denoising use different model components, and closed-loop control couples response time to subsequent arrivals. Optimized inference runtimes and model-level work reduction (Su, 2026; Su et al., 2026; Xu et al., 2026; Tan et al., 2025) complement our service; RTC maintains action-chunk continuity during ongoing motion (Black et al., 2025b). XInfer coordinates shared execution using per-request response-time budgets.

SLO-aware GPU sharing.

Clockwork uses predictable execution to meet request latency targets (Gujarati et al., 2020). SLOs-Serve allocates work to meet application- and stage-specific SLOs (Chen et al., 2025; Hong et al., 2025b), while Orion limits interfering kernels and REEF supports controlled kernel preemption (Strati et al., 2024; Han et al., 2022). Our admission tests adapt slack stealing and non-preemptive blocking analysis from real-time scheduling (Lehoczky and Ramos-Thuel, 1992; Audsley et al., 1993; Jeffay et al., 1991). They use request progress, calibrated concurrent interference, and arrival history to protect current and anticipated deadlines at VLA stage boundaries. Issued stages remain non-preemptive, and feasibility is predicted rather than established by worst-case timing bounds.

8 Conclusion

XInfer is a production-deployed VLA serving system that coordinates shared GPU computation with the changing feedback needs of robotic execution. Its asynchronous engine exposes parallelism across requests and stages, while execution-aware scheduling separates request priority from stage admission to control interference on current and anticipated urgent requests. Across three VLA models, XInfer achieves 1.26–3.75\times the effective robot capacity of the compared systems under a common response-latency criterion. Under heterogeneous SLOs, it also improves attainment and on-time goodput. These results demonstrate how coordinating parallelism and interference around execution-dependent feedback requirements enables more efficient serving of robot fleets.

Contributors

Fleetserve is a collaborative effort of the X Square Robot team. The full contributor list is given below; ∗ denotes core contributors, † denotes the project lead, and ‡ denotes the corresponding author.

Yue Zhang∗, Zicong Ye∗, Lufang Chen∗†, Dance Yang, Mingyang Li, Zhenwei Duan, Michael Zhao, Ziye Deng, Starrick Liu, Ruizhi Chengze, YongHua Chen, SongAo Han, Yu Sun, Ran Yu, Xiaofan Li, Ruyi Gan, Hao Wang‡

References

  1. Adamopoulos et al. (2026) D. Adamopoulos, N. Chanpaisit, B. Fakhri, and C. Giannoula Efficient vision-language-action management and serving for robot factories. arXiv preprint arXiv:2609.12075. External Links: Link
  2. Agrawal et al. (2024) A. Agrawal, N. Kedia, A. Panwar, J. Mohan, N. Kwatra, B. S. Gulavani, A. Tumanov, and R. Ramjee Taming throughput-latency tradeoff in LLM inference with Sarathi-Serve. In 18th USENIX Symposium on Operating Systems Design and Implementation (OSDI 24), pp. 117–134. External Links: Link
  3. Anonymous Authors (n.d.) Anonymous Authors Armory: action chunk scheduling for batched robot policy serving. Note: Project page, under review. Accessed October 30, 2026 External Links: Link
  4. Audsley et al. (1993) N. Audsley, A. Burns, M. Richardson, K. Tindell, and A. J. Wellings Applying new scheduling theory to static priority pre-emptive scheduling. Software Engineering Journal 8 (5), pp. 284–292. External Links: Document
  5. Black et al. (2025a) K. Black, N. Brown, J. Darpinian, K. Dhabalia, D. Driess, A. Esmail, M. R. Equi, C. Finn, N. Fusai, M. Y. Galliker, D. Ghosh, L. Groom, K. Hausman, B. Ichter, S. Jakubczak, T. Jones, L. Ke, D. LeBlanc, S. Levine, A. Li-Bell, M. Mothukuri, S. Nair, K. Pertsch, A. Z. Ren, L. X. Shi, L. Smith, J. T. Springenberg, K. Stachowicz, J. Tanner, Q. Vuong, H. Walke, A. Walling, H. Wang, L. Yu, and U. Zhilinsky \pi_{0.5}: A vision-language-action model with open-world generalization. In Proceedings of The 9th Conference on Robot Learning, Proceedings of Machine Learning Research, Vol. 305, pp. 17–40. External Links: Link
  6. Black et al. (2025b) K. Black, M. Galliker, and S. Levine Real-time execution of action chunking flow policies. In Advances in Neural Information Processing Systems, Vol. 38, pp. 33383–33407. External Links: Document
  7. Chen et al. (2025) S. Chen, Z. Jia, S. Khan, A. Krishnamurthy, and P. B. Gibbons SLOs-Serve: optimized serving of multi-SLO LLMs. arXiv preprint arXiv:2504.08784. External Links: Link
  8. Chi et al. (2023) C. Chi, S. Feng, Y. Du, Z. Xu, E. Cousineau, B. Burchfiel, and S. Song Diffusion Policy: visuomotor policy learning via action diffusion. In Proceedings of Robotics: Science and Systems (RSS), External Links: Document
  9. Dai et al. (2026) Y. Dai, G. Ananthanarayanan, L. Cox, X. Foukas, B. Radunovic, and R. Netravali Kairos: a scalable serving system for physical AI. arXiv preprint arXiv:2605.11381. External Links: Link
  10. Gujarati et al. (2020) A. Gujarati, R. Karimi, S. Alzayat, W. Hao, A. Kaufmann, Y. Vigfusson, and J. Mace Serving DNNs like Clockwork: performance predictability from the bottom up. In 14th USENIX Symposium on Operating Systems Design and Implementation (OSDI 20), pp. 443–462. External Links: Link
  11. Han et al. (2022) M. Han, H. Zhang, R. Chen, and H. Chen Microsecond-scale preemption for concurrent GPU-accelerated DNN inferences. In 16th USENIX Symposium on Operating Systems Design and Implementation (OSDI 22), pp. 539–558. External Links: Link
  12. Hong et al. (2025a) K. Hong, L. Chen, Z. Wang, X. Li, Q. Mao, J. Ma, C. Xiong, G. Wu, B. Han, G. Dai, Y. Liang, and Y. Wang semi-PD: towards efficient LLM serving via phase-wise disaggregated computation and unified storage. arXiv preprint arXiv:2504.19867. External Links: Link
  13. Hong et al. (2025b) K. Hong, X. Li, L. Chen, Q. Mao, X. Ning, G. Dai, S. Yan, Y. Liang, and Y. Wang SOLA: optimizing SLO attainment for large language model serving with state-aware scheduling. In Proceedings of Machine Learning and Systems, Vol. 7. External Links: Link
  14. Jeffay et al. (1991) K. Jeffay, D. F. Stanat, and C. U. Martel On non-preemptive scheduling of periodic and sporadic tasks. In Proceedings of the Twelfth IEEE Real-Time Systems Symposium (RTSS), pp. 129–139. External Links: Document
  15. Jiang et al. (2026) W. Jiang, J. Clemons, R. O’Flaherty, H. Hadfield, A. Degirmenci, S. Song, Y. Narang, and C. Kozyrakis ROSA: a robotics foundation model serving system for robot factories. arXiv preprint arXiv:2607.01088. External Links: Link
  16. Lehoczky and Ramos-Thuel (1992) J. P. Lehoczky and S. Ramos-Thuel An optimal algorithm for scheduling soft-aperiodic tasks in fixed-priority preemptive systems. In Proceedings of the IEEE Real-Time Systems Symposium (RTSS), pp. 110–123. External Links: Document
  17. Lipman et al. (2023) Y. Lipman, R. T. Q. Chen, H. Ben-Hamu, M. Nickel, and M. Le Flow matching for generative modeling. In International Conference on Learning Representations (ICLR), External Links: Link
  18. Liu and Layland (1973) C. L. Liu and J. W. Layland Scheduling algorithms for multiprogramming in a hard-real-time environment. Journal of the ACM 20 (1), pp. 46–61. External Links: Document
  19. NVIDIA (2026) NVIDIA Multi-process service. Note: Documentation. Last updated September 9, 2026. Accessed October 30, 2026 External Links: Link
  20. Patel et al. (2024) P. Patel, E. Choukse, C. Zhang, A. Shah, Í. Goiri, S. Maleki, and R. Bianchini Splitwise: efficient generative LLM inference using phase splitting. In ACM/IEEE 51st Annual International Symposium on Computer Architecture (ISCA), pp. 118–132. External Links: Document
  21. Rouhani et al. (2023) B. D. Rouhani, R. Zhao, A. More, M. Hall, A. Khodamoradi, S. Deng, D. Choudhary, M. Cornea, E. Dellinger, K. Denolf, D. Stosic, V. Elango, M. Golub, A. Heinecke, P. James-Roxby, D. Jani, G. Kolhe, M. Langhammer, A. Li, L. Melnick, M. Mesmakhosroshahi, A. Rodriguez, M. Schulte, R. Shafipour, L. Shao, M. Siu, P. Dubey, P. Micikevicius, M. Naumov, C. Verrilli, R. Wittig, D. Burger, and E. Chung Microscaling data formats for deep learning. arXiv preprint arXiv:2310.10537. External Links: Link
  22. Strati et al. (2024) F. Strati, X. Ma, and A. Klimovic Orion: interference-aware, fine-grained GPU sharing for ML applications. In Proceedings of the Nineteenth European Conference on Computer Systems (EuroSys), pp. 1075–1092. External Links: Document
  23. Su et al. (2026) L. Su, D. Chen, J. Li, K. Guo, and T. Lv FlashRT-PAI: fast kernels are not fast pipelines for physical AI inference. arXiv preprint arXiv:2610.24349. External Links: Link
  24. Su (2026) L. Su FlashRT. Note: Software repository. Accessed October 30, 2026 External Links: Link
  25. Tan et al. (2025) X. Tan, Y. Yang, P. Ye, J. Zheng, B. Bai, X. Wang, J. Hao, and T. Chen Think twice, act once: token-aware compression and action reuse for efficient inference in vision-language-action models. arXiv preprint arXiv:2505.21200. External Links: Link
  26. Xu et al. (2026) L. Xu, B. Li, H. Wu, C. Han, X. Li, M. Hua, S. Jiang, T. Cao, C. Li, S. Zhong, and S. Wang Embodied.cpp: a portable inference runtime of embodied AI models on heterogeneous robots. arXiv preprint arXiv:2607.02501. External Links: Link
  27. Yin et al. (2026) P. Yin, J. Zhu, H. Gao, C. Zheng, Y. Huang, T. Zhou, R. Yang, W. Liu, W. Chen, C. Guo, D. Deng, Z. Mo, C. Wang, J. Cheng, R. Wang, and H. Liu vLLM-Omni: fully disaggregated serving for any-to-any multimodal models. arXiv preprint arXiv:2602.02204. External Links: Link
  28. Yu et al. (2022) G. Yu, J. S. Jeong, G. Kim, S. Kim, and B. Chun Orca: a distributed serving system for Transformer-Based generative models. In 16th USENIX Symposium on Operating Systems Design and Implementation (OSDI 22), pp. 521–538. External Links: Link
  29. Yu et al. (2026) R. Yu, P. Zhang, S. Liu, B. Liu, M. Kang, S. Li, L. Shi, E. Ma, P. Yang, C. Pan, J. Chen, D. Liu, R. Sun, M. Guo, B. Zhang, H. Zhou, Z. Xu, V. Chen, H. Huang, J. Wang, D. Kuzi, A. Zhai, H. Su, R. Gan, L. Liang, H. Wang, and Q. Wang Wall-OSS-0.5 technical report. arXiv preprint arXiv:2605.30877. External Links: Link
  30. Zhai et al. (2025) A. Zhai, B. Liu, B. Fang, C. Cai, E. Ma, E. Yin, H. Wang, H. Zhou, J. Wang, L. Shi, L. Liang, M. Wang, Q. Wang, R. Gan, R. Yu, S. Li, S. Liu, S. Chen, V. Chen, and Z. Xu Igniting vlms toward the embodied space. arXiv preprint arXiv:2509.11766.
  31. Zhao et al. (2023) T. Z. Zhao, V. Kumar, S. Levine, and C. Finn Learning fine-grained bimanual manipulation with low-cost hardware. In Proceedings of Robotics: Science and Systems (RSS), External Links: Document
  32. Zheng et al. (2024) L. Zheng, L. Yin, Z. Xie, C. Sun, J. Huang, C. H. Yu, S. Cao, C. Kozyrakis, I. Stoica, J. E. Gonzalez, C. Barrett, and Y. Sheng SGLang: efficient execution of structured language model programs. In Advances in Neural Information Processing Systems, Vol. 37, pp. 62557–62583. External Links: Document
  33. Zhong et al. (2024) Y. Zhong, S. Liu, J. Chen, J. Hu, Y. Zhu, X. Liu, X. Jin, and H. Zhang DistServe: disaggregating prefill and decoding for goodput-optimized large language model serving. In 18th USENIX Symposium on Operating Systems Design and Implementation (OSDI 24), pp. 193–210. External Links: Link

AI Usage Disclosure

The authors led the system and experimental designs. We used OpenAI ChatGPT/Codex and Anthropic Claude to generate and iteratively revise implementation code and experimental, analysis, and plotting scripts based on the authors’ specifications. The tools also assisted with literature review and drafting and revising multiple manuscript sections. The authors determine the final designs and content and take full responsibility for the accuracy and integrity of the paper.

Appendix A Response Latency and Physical Task Efficiency

Figure 11: Response delay increases physical effort, with different effects across parcel types. Each point averages five tasks of one type; the black line is the mean of the four types and the band their range. Zero denotes no added delay. Full counts are in Table 4.

A.1 Sustained Parcel Handling

Protocol and latency criterion.

We use one robot and VLA-2B BF16 (execute_horizon=7), holding inference settings fixed. Each of six added-delay settings has three five-minute trials. Delay is inserted between inference completion and response delivery; baseline response latency is approximately 50\,\mathrm{ms}. Table 3 distinguishes all handled parcels from those reaching the required task endpoint.

Table 3: Hourly parcel rates under added response delay. Handled and completed are measured aggregate rates; handled SD is estimated from three trial markers digitized from the source plot. Figure 2 uses handled rates.
  • 0
    Handled parcels/h
    1968
    Completed parcels/h
    1920
    Handled SD
    86.5
  • 25
    Handled parcels/h
    1944
    Completed parcels/h
    1912
    Handled SD
    43.3
  • 50
    Handled parcels/h
    2020
    Completed parcels/h
    1968
    Handled SD
    73.3
  • 100
    Handled parcels/h
    1892
    Completed parcels/h
    1812
    Handled SD
    66.1
  • 150
    Handled parcels/h
    1552
    Completed parcels/h
    1516
    Handled SD
    96.2
  • 200
    Handled parcels/h
    1376
    Completed parcels/h
    1352
    Handled SD
    129.4

Completed output falls 29.6% at 200\,\mathrm{ms} added delay. Handling throughput drops 6.3% from 50 to 100\,\mathrm{ms}, then 18.0% from 100 to 150\,\mathrm{ms}. Selecting 100\,\mathrm{ms} before this steeper loss, plus the 50\,\mathrm{ms} baseline, motivates the 150\,\mathrm{ms} response-P50 criterion (Section 6.1).

Predicted parcel-handling throughput.

Figure 2 maps serving latency to fleet parcel throughput for 1–16 robots. Let q(\Delta) interpolate the handled rates in Table 3, and \widetilde{R}_{s}(N) interpolate mean per-run response P50s across robot counts for system s (Figure 7). Both interpolations are piecewise linear. Up to 250\,\mathrm{ms} response latency,

\widehat{Q}_{s}(N)=N\,q\!\left(\max\{0,\widetilde{R}_{s}(N)-50\,\mathrm{ms}\}\right).
(5)

Subtracting 50\,\mathrm{ms} removes baseline latency; faster responses use the zero-injection rate. FlashRT’s measured P50 reaches 505.4\,\mathrm{ms} at 16 robots. Beyond 250\,\mathrm{ms}, dashed curves extrapolate per-parcel handling time:

q_{\rm ext}(\Delta)=\frac{3600}{t_{200}+k(\Delta-200)},\qquad\Delta>200.
(6)

Here \Delta is added delay in milliseconds, q_{\rm ext} is in parcels/h, and t_{200}=3600/1376=2.6163 seconds per parcel. The slope k=0.0071353 seconds per millisecond is fitted to 3600/q(\Delta) at 100, 150, and 200\,\mathrm{ms} using only physical calibration data. Adjacent-interval slope fits give FlashRT 12,137–13,940 parcels/h at 16 robots, so its comparison with seven FleetServe robots depends on the extrapolation slope.

Uncertainty and scope.

Using Table 3’s sample SDs s_{j}, we linearly interpolate variance v(\Delta) within calibration and shade N[q(\Delta)\pm\sqrt{v(\Delta)}], using s_{0}^{2} below baseline. Beyond 250\,\mathrm{ms}, independent sample-SD perturbations of the calibration means \bar{q}_{100} and \bar{q}_{200} propagate through both the anchor and fitted slope, giving first-order half-width

B(N,\Delta)=N\sqrt{\sum_{j\in\{100,200\}}\left(\frac{\partial q_{\rm ext}}{\partial\bar{q}_{j}}\right)^{2}s_{j}^{2}}.
(7)

Serving P50s remain fixed. These bands quantify sensitivity to single-robot variation, not confidence intervals or fleet-level SDs; they exclude digitization, latency, and model-form uncertainty.

The projection transfers BF16, horizon-7 calibration to MXFP8 Context/BF16 Action with RTC d=8, assuming identical, independent robots with fixed task mix and control behavior. It treats P50 as constant delay and omits jitter and shared physical bottlenecks; it is distinct from measured multi-robot task output and ERC.

A.2 Manipulation Attempts by Parcel Type

Protocol.

We evaluate parcel reorientation (barcode initially down) and conveyor pushing (barcode initially up) with VLA-2B BF16 and execute_horizon=7; baseline model latency is approximately 45\,\mathrm{ms}. Each task tests the four parcel types in Table 4, with five trials per type at each added delay from 0 to 500\,\mathrm{ms} in 50\,\mathrm{ms} increments. A pushing attempt is one complete push; injected delay differs from full response latency.

Effect on manipulation effort.

Attempt counts vary by parcel type and need not increase monotonically with delay (Figure 11). Mean flip attempts rise from 1.05 without added delay to 1.75 at 350\,\mathrm{ms}; mean push attempts rise from 1.00 to 1.50–1.70 at 350–500\,\mathrm{ms}. Table 4 gives the complete counts.

Table 4: Manipulation attempts (flip/push) by parcel type under added response delay. Type columns give totals over five tasks; Mean gives averages over twenty tasks.
  • 0
    Carton A
    6/5
    Gray bag
    5/5
    Carton B
    5/5
    Long carton C
    5/5
    Mean
    1.05/1.00
  • 50
    Carton A
    6/5
    Gray bag
    5/5
    Carton B
    6/5
    Long carton C
    6/5
    Mean
    1.15/1.00
  • 100
    Carton A
    5/5
    Gray bag
    6/8
    Carton B
    6/5
    Long carton C
    7/5
    Mean
    1.20/1.15
  • 150
    Carton A
    6/7
    Gray bag
    5/8
    Carton B
    7/6
    Long carton C
    6/5
    Mean
    1.20/1.30
  • 200
    Carton A
    6/6
    Gray bag
    6/7
    Carton B
    8/6
    Long carton C
    6/5
    Mean
    1.30/1.20
  • 250
    Carton A
    8/5
    Gray bag
    6/8
    Carton B
    6/5
    Long carton C
    5/6
    Mean
    1.25/1.20
  • 300
    Carton A
    7/7
    Gray bag
    10/6
    Carton B
    9/6
    Long carton C
    7/5
    Mean
    1.65/1.20
  • 350
    Carton A
    11/8
    Gray bag
    8/8
    Carton B
    9/7
    Long carton C
    7/7
    Mean
    1.75/1.50
  • 400
    Carton A
    7/8
    Gray bag
    9/11
    Carton B
    5/5
    Long carton C
    5/10
    Mean
    1.30/1.70
  • 450
    Carton A
    12/9
    Gray bag
    7/11
    Carton B
    5/5
    Long carton C
    5/8
    Mean
    1.45/1.65
  • 500
    Carton A
    9/8
    Gray bag
    8/7
    Carton B
    6/7
    Long carton C
    6/10
    Mean
    1.45/1.60

Appendix B Serving Evaluation: Detailed Results

B.1 Protocol and Configuration

Measurement and aggregation.

Section 6.1 defines the workload and timing boundaries. Warmup uses the target robot population. The 180\,\mathrm{ms} request period corresponds to six 30\,\mathrm{ms} model steps in production. Latency statistics include responses completed after the measurement window for requests sent within it. We average per-window P50/P95/P99 and QPS; whiskers show the observed min–max range. Each repeat restarts the client, while the model service may remain resident.

RTC handoff.

After freezing the first d keyframes, RTC (Black et al., 2025b) guides subsequent keyframes toward the remaining old trajectory with decaying weight and generates the rest freely. Excessive commitment is over-freezing; a response after t_{k}+d\Delta causes a handoff violation, whereas starvation means available actions run out before replacement. A trigger miss occurs when s_{j}+T_{E} passes while request j remains in flight (Equation 1).

Input preprocessing.

VLA-2B and Wall-OSS-0.5 merge image patches in their trained encoders. \pi_{0.5} instead averages non-overlapping 2\times2 patch blocks after the full ViT, producing 77, 70, and 70 tokens across the three cameras. Equal visual-token counts do not imply equal total FLOPs. Its native FlashRT backend uses per-tensor FP8 E4M3 with BF16 inputs and outputs; Section 5 specifies the other precision settings.

The shared instruction retains its original metadata. Wall-X converts, normalizes, and discretizes the all-zero 14-dimensional state into 20 values, encoded as 72/74 tokens for VLA-2B/Wall-OSS-0.5. \pi_{0.5} uses identity normalization and its native state-as-text formatter, padding to 32 dimensions and discretizing into 256 bins. This synthetic state is not a calibrated physical-robot state policy. State labels, punctuation, and special markers belong to the template column of Table 1.

Serving interfaces.

SGLang and vLLM-Omni retain their queues. FlashRT uses its native single-consumer model session over HTTP with JSON/base64; the other paths use WebSocket with MessagePack. Transport costs are included in response latency. \pi_{0.5} enables Context-completion notification.

B.2 ERC Validation

We apply the criterion in Section 6.1 to unrounded window-level values: every window at the reported ERC must pass, and the adjacent larger population must fail in at least one window. For \pi_{0.5}, XInfer passes at 24 robots with P50s of 133.470–136.592\,\mathrm{ms} and mean QPS 132.31; all three windows at 25 robots fail (163.104–166.842\,\mathrm{ms}). VLA-2B Robion at 12 robots and \pi_{0.5} Robion at 20 robots each pass in only two of three windows, despite passing on mean P50.

B.3 Robion Reproduction Settings

Table 5 specifies our single-GPU reproduction of Robion (Adamopoulos et al., 2026).

Table 5: Robion configuration used in the serving-system comparison.
  • Scope
    Configuration
    Single-model serving; distributed placement and routing are excluded.
  • Execution units
    Configuration
    Context and Action each use a sequential CUDA stream with a dedicated CPU submission thread.
  • Round progression
    Configuration
    Context work in round k overlaps Action work from round k-1; the next round starts after both finish.
  • Result publication
    Configuration
    Publish completed Action results after the round barrier (a reproduction choice); CPU output processing may overlap the next GPU round.
  • SM allocation
    Configuration
    An offline lookup selects the Context SM quota that minimizes full-round CUDA completion time; Action remains unrestricted.
  • CUDA Graphs
    Configuration
    Capture supported execution-unit and Context SM configurations before measurement.
  • CPU preparation
    Configuration
    Keep input preparation pipelined with GPU execution.

B.4 Execution Mechanisms

Table 6: Incremental ablations on \pi_{0.5} using a multi-stream baseline. M denotes execution-aware concurrency, C CPU–GPU overlap, R independent progression, and G GPU-stage overlap. C, R, and G are enabled individually on top of M. All-Off disables all four mechanisms. QPS is measured in requests/s. P50, P95, and P99 are client response latencies in ms.
  • 8
    Configuration
    All-Off
    QPS
    44.26
    P50
    20.00
    P95
    26.92
    P99
    32.46
  • No data
    Configuration
    M
    QPS
    44.25
    P50
    19.51
    P95
    24.50
    P99
    30.54
  • No data
    Configuration
    M+C
    QPS
    44.26
    P50
    19.87
    P95
    24.82
    P99
    27.34
  • No data
    Configuration
    M+R
    QPS
    44.25
    P50
    20.40
    P95
    31.38
    P99
    33.66
  • No data
    Configuration
    M+G
    QPS
    44.27
    P50
    19.67
    P95
    20.54
    P99
    21.08
  • No data
    Configuration
    M+C+R+G
    QPS
    44.27
    P50
    19.85
    P95
    21.19
    P99
    21.71
  • 16
    Configuration
    All-Off
    QPS
    54.81
    P50
    305.80
    P95
    350.92
    P99
    364.93
  • No data
    Configuration
    M
    QPS
    87.98
    P50
    145.05
    P95
    184.75
    P99
    208.85
  • No data
    Configuration
    M+C
    QPS
    88.44
    P50
    85.00
    P95
    97.11
    P99
    103.96
  • No data
    Configuration
    M+R
    QPS
    87.46
    P50
    152.56
    P95
    193.70
    P99
    224.76
  • No data
    Configuration
    M+G
    QPS
    88.44
    P50
    109.63
    P95
    151.40
    P99
    172.86
  • No data
    Configuration
    M+C+R+G
    QPS
    88.51
    P50
    39.46
    P95
    61.53
    P99
    73.70
  • 32
    Configuration
    All-Off
    QPS
    53.77
    P50
    581.14
    P95
    672.59
    P99
    691.47
  • No data
    Configuration
    M
    QPS
    90.57
    P50
    351.93
    P95
    428.52
    P99
    467.07
  • No data
    Configuration
    M+C
    QPS
    100.79
    P50
    327.11
    P95
    352.05
    P99
    362.57
  • No data
    Configuration
    M+R
    QPS
    99.33
    P50
    311.91
    P95
    461.74
    P99
    560.28
  • No data
    Configuration
    M+G
    QPS
    96.67
    P50
    327.68
    P95
    423.47
    P99
    475.40
  • No data
    Configuration
    M+C+R+G
    QPS
    132.24
    P50
    235.18
    P95
    310.03
    P99
    378.06
Cumulative protocol.

Figure 9 follows the sequence in Section 6.4 at 24 robots with fixed inputs, backend, and resources. All-Off and all-enabled each use two windows, while intermediate configurations use one, totaling six displayed windows under Appendix B.1. Values average per-window P50 and QPS. Execution-aware concurrency enables intra-stage concurrency with the round barrier retained. Cross-stage coordination combines Context–Action overlap with independent progression, removing that barrier. Gains depend on the enabling order. This study does not re-estimate ERC.

Incremental controls.

Table 6 evaluates six configurations at 8, 16, and 32 robots, each with a separate service start and one window. All-Off serializes GPU stages, allows one request per stage, and retains a round barrier. M denotes execution-aware concurrency with the selected intra-stage streams, concurrency, and batching limits. C overlaps CPU preparation and output processing with GPU work. R removes only the round barrier. G overlaps combined ViT–Prefill (Context) with Action on the GPU. R and G are the two components of cross-stage coordination. M+C, M+R, and M+G each add one mechanism to M. All-enabled combines them. Lockstep states share a round-admission rule, and completed results can return without waiting for the barrier. Inputs, weights, precision, kernels, workspaces, KV storage, and captured graphs remain fixed with completion notification enabled.

Throughput and tail latency.

At 32 robots, M+R improves QPS and P50 over M while increasing P95/P99. All-enabled remains above the capacity latency threshold (Table 6).

Table 7: Wall-time shares (%) at N=32 over 61–69 s. Ind./Lock.: independent/lockstep; off/on: CPU overlap. Either/Both: union/intersection of Context/Action kernel intervals. CPU/GPU: kernel overlap with instrumented CPU preparation/output scopes.
  • VLA-2B
    State
    Ind., off
    Either
    85.49
    Both
    58.36
    CPU/GPU
    0.00
  • No data
    State
    Ind., on
    Either
    99.72
    Both
    79.73
    CPU/GPU
    56.85
  • No data
    State
    Lock., on
    Either
    90.79
    Both
    25.45
    CPU/GPU
    11.28
  • Wall-OSS-0.5
    State
    Ind., off
    Either
    82.05
    Both
    55.35
    CPU/GPU
    0.00
  • No data
    State
    Ind., on
    Either
    98.78
    Both
    87.78
    CPU/GPU
    26.88
  • No data
    State
    Lock., on
    Either
    87.55
    Both
    68.99
    CPU/GPU
    14.49
  • \pi_{0.5}
    State
    Ind., off
    Either
    72.79
    Both
    19.08
    CPU/GPU
    0.00
  • No data
    State
    Ind., on
    Either
    94.73
    Both
    28.80
    CPU/GPU
    19.60
  • No data
    State
    Lock., on
    Either
    72.44
    Both
    18.26
    CPU/GPU
    4.04
GPU execution timelines.

Nine separate profiler runs compare three states per model at N=32: independent progression with CPU overlap disabled/enabled, and lockstep with CPU overlap enabled. Environments and configurations match within each model; profiler configurations differ from the ablations above. CPU controls toggle preparation/output overlap with GPU work; progression controls only the round barrier, retaining cross-stage overlap. Two host-clock markers align the traces; Table 7 summarizes 61–69 s and Figure 12 shows an excerpt. With CPU overlap disabled, CPU/GPU intersection is zero at display precision (below 0.001% for \pi_{0.5}). These shares measure activity, not SM occupancy or MFU; profiler throughput is excluded from ERC.

Figure 12: CPU–GPU overlap reduces idle gaps in a separate profiler diagnostic. VLA-2B serves 32 robots with overlap (a) disabled and (b) enabled. The figure shows the 61–61.5 s excerpt; the outlined gap marks an observed GPU idle interval. Table 7 reports statistics for the full profiling window.

Appendix C SLO-Aware Scheduling: Model and Detailed Results

C.1 Prediction and Dispatch Model

The central backend schedules non-preemptive units at three boundaries: ViT, post-vision Prefill, and a complete Action denoising trajectory. Its evaluation uses batch size one. The response-latency SLO b_{j} is converted to a server deadline \ell_{j}=a_{j}+b_{j}-\delta, where a_{j} is server arrival time and \delta=4\,\mathrm{ms}{} reserves estimated time outside the server. The request does not carry its robot-side send timestamp.

Progress-aware remaining-time model.

For stages s\in\{V,P,A\} in pipeline order, define

q_{s}(\mathbf{n})=h_{s}+\frac{W_{s}}{\rho_{s}(\bar{\mathbf{n}})},\qquad\bar{n}_{s}=\min(n_{s},c_{s}).
(8)

W_{s} is calibrated stage work in isolation-time units, \rho_{s} is a dimensionless rate table, and h_{s} is stage-issue overhead. Every rate lookup is clipped to the calibrated bounds \mathbf{c}. For a running stage s, the supplied counts include request j’s own unit; its rate therefore uses \mathbf{n}^{-j}=[\mathbf{n}-\mathbf{e}_{s}]_{+}, where \mathbf{e}_{s} is the unit vector for stage s and the positive part is componentwise. Waiting and downstream stages use q_{s}(\mathbf{n}) without subtraction. In foreseeable load \mathbf{n}_{f}, protected ready units already included by the scheduler remain in this lookup, even for their own requests. The supplied load approximates future concurrency.

Let \mathbf{n}_{r}(u) be the scheduler-observed running counts at time u, including request j’s own unit, and define \mathbf{n}_{r}^{-j}(u)=[\mathbf{n}_{r}(u)-\mathbf{e}_{s}]_{+}. For a stage issued at \tau_{j}, its modeled compute start is b_{j,s}=\tau_{j}+h_{s}. Completed work and residual time are

\begin{split}\widehat{w}_{j,s}(t)&=\int_{b_{j,s}}^{\max(t,b_{j,s})}\rho_{s}(\overline{\mathbf{n}_{r}^{-j}(u)})\,du,\\
\widetilde{r}_{j,s}(t,\mathbf{n})&=[b_{j,s}-t]_{+}+\frac{[W_{s}-\widehat{w}_{j,s}(t)]_{+}}{\rho_{s}(\overline{\mathbf{n}^{-j}})}.\end{split}
(9)

Here [x]_{+}=\max(0,x). The integral is a sum over intervals between observed stage transitions. Historical rates determine completed work; the supplied load determines the rate used for the remaining work. The remaining pipeline time is

\begin{split}R_{j}(\mathbf{n})&=h_{\mathrm{out}}+r_{j,s}(\mathbf{n})+\sum_{k>s}q_{k}(\mathbf{n}),\\
r_{j,s}(\mathbf{n})&=\begin{cases}q_{s}(\mathbf{n}),&\text{waiting},\\
\widetilde{r}_{j,s}(t,\mathbf{n}),&\text{running}.\end{cases}\end{split}
(10)

The term h_{\mathrm{out}} covers output processing. A completion event advances the request to its next stage. Future stages use the same projected load, without an additional prediction of future queueing delay. The counters describe scheduler in-flight units, including observation delay.

Calibration.

The rate table comes from a microbenchmark with RTC d=8 and B1 Action trajectories. It measures isolated and mixed-stage execution at 167 concurrency combinations, repeated three times per calibration instance. Rates are derived from isolated work divided by measured unit duration. The frozen table incorporates stage corrections and a common work factor of 1.02 fitted during simulator calibration. This yields (W_{V},W_{P},W_{A})=(4.328931,8.907749,12.116308)\,\mathrm{ms}{}. The model uses (h_{V},h_{P},h_{A})=(2.1,0.25,1.1)\,\mathrm{ms}{} and h_{\mathrm{out}}=1.2\,\mathrm{ms}{}; h_{A} includes preparation and KV copying. The front-end reserve f=8.5\,\mathrm{ms}{} is added only for forecast arrivals below. These parameters were frozen before the reported final-policy GPU comparisons and are not fitted to their outcomes.

Current-request protection.

Algorithm 2 implements the promotion and protection rules of Section 4.3, refreshing the effective protected set H and foreseeable load \mathbf{n}_{f} as the promoted set \mathcal{P} grows. Ordinary dispatch must preserve every protected request’s predicted feasibility; these predictions are not worst-case timing bounds or SLO guarantees.

Arrival-aware admission.

Recent arrivals are grouped by observed SLO value. For a value seen k>0 times in the rolling window P=180\,\mathrm{ms}{}, forecasts start at \max(t,a_{\mathrm{last}}+P/k) and repeat every P/k, without robot identities or predefined tight/wide classes. Before issuing ordinary unit u, ForecastFeasible (Section 4.4) checks forecasts during u’s estimated execution, retaining only those with \ell_{e}<\ell_{u}. Its projected load \mathbf{n}^{\prime}_{e} adds u to foreseeable load and accumulates earlier retained ViT forecasts. The front-end reserve is f=8.5\,\mathrm{ms}{}; physical resources still bound concurrency.

Algorithm 2 Refresh protected requests and foreseeable load
Termination of priority refresh.

With time, live requests \mathcal{J}, and execution state fixed, each nonempty update only adds members to \mathcal{P}, so the loop terminates within |\mathcal{J}|-|\mathcal{P}_{0}|+1 evaluations including the final empty update, where \mathcal{P}_{0} is the initial promoted set after intersection with \mathcal{J}, without requiring monotonic calibrated rates.

In Algorithm 1, ScanReady initially orders each stage’s ready work by protected status, deadline, then request ID. After each launch updates occupancy and refreshes priority, Action retains its remaining order, while Prefill and ViT rebuild it. Failed checks advance the scan while leaving candidates queued; both checks apply only to ordinary work.

C.2 Running-Stage Prediction Accuracy

Protocol and causal replay.

We evaluate the remaining execution time of running stages using Equation 9, with one recorded run each at 8, 18, and 20 robots under the alternating 90/400\,\mathrm{ms} workload. We use the frozen calibration and lookup bounds of Appendix C.1. At the first policy observation at least 20\,\mathrm{ms} after the preceding sample, we capture request state and final foreseeable load, without adding predictor evaluations to the scheduling path. We retain valid running-stage forecasts for requests sent in [30,210) s and track each sampled stage through its observed completion.

Replay integrates scheduler-observed dispatch and retirement transitions strictly before forecast time t and uses the captured \mathbf{n}_{f}. Tests verify that changing future events cannot change a prediction. The artifact retains the pre-run protocol, instrumentation, analysis scripts, and raw traces.

Stage endpoints and aggregation.

ViT and Prefill end when completion is observed by the scheduler. Action ends after its RPC and CPU output processing. The stage-endpoint estimate \widehat{r}_{j,s}(t) equals \widetilde{r}_{j,s}(t,\mathbf{n}_{f}) from Equation 9, with the fixed h_{\mathrm{out}} added for Action. The signed prediction error is

e_{j,s,t}=t^{\mathrm{actual}}_{j,s,\mathrm{end}}-t-\widehat{r}_{j,s}(t).
(11)

Positive error denotes underprediction. Primary mean absolute errors (MAEs) weight each forecast equally. Request-balanced summaries give each represented request equal total weight within a robot population or stage, divided equally among its forecasts.

Results.

Across all running-stage samples, current-stage MAE is 2.04/2.62/2.79\,\mathrm{ms} at 8/18/20 robots. With equal request weights within each stage, MAE is 1.91–2.49\,\mathrm{ms} for ViT and Prefill and 2.15–3.05\,\mathrm{ms} for Action. Figure 13 shows both error directions.

Figure 13: Remaining-time prediction errors for running stages. Positive error is underprediction. Each represented request has equal total weight within its robot population. Curves include both tails; the horizontal scale is logarithmic outside [-1,1]\,\mathrm{ms}.

C.3 GPU Ablations and Scheduling Cost

Recorded task phases.

Eight recorded \pi_{0.5} block-stacking episodes motivate the alternating phase workload. Marking 1.0 s before to 0.5 s after each gripper switch as critical covers 15–72% of each trace. The evaluation abstracts these phase patterns into controlled 90/400\,\mathrm{ms} budgets and 30-response phases.

Workloads and measurement.

The GPU controls use the workloads in Section 6.3, with batch-size-one execution, a 180\,\mathrm{ms} minimum send interval, and RTC d=8. Appendix C.5 specifies the parcel-handling trace. Response latency spans the client send to receipt of the complete response. We retain requests sent during [30,210) s through completion and divide their on-time response count by 180 s for goodput. Unless stated otherwise, bursty results cover this full window; burst-only results use 60–80 s and 120–140 s. All measured requests complete successfully.

Component controls.

Five controls change one mechanism or a specified policy combination while matching the full policy’s execution resources. Removing interference modeling uses isolated-stage durations without changing actual execution. Strict priority gating replaces both slack stealing and arrival-aware admission: ordinary work waits whenever a protected request exists. Removing arrival-aware admission retains current-request protection. Entry-only admission checks before ViT; Prefill and Action advance in priority/deadline order when resources permit. Zero-slack promotion sets the blocking term to zero.

Each of three campaigns rotates policy order across three matched rounds, with a 75 s premeasurement smoke run. In Table 8, full-policy means pool nine rounds, while each difference uses its own campaign’s three paired rounds. Zero-slack promotion has mixed effects.

Table 8: GPU component ablations. Strict gating jointly replaces slack stealing and arrival-aware admission. FS: SLO attainment of full FleetServe (mean of the nine rounds in the three campaigns, %). Other columns: gain of full FleetServe over each variant (percentage points, mean of three rounds paired with full FleetServe in the same campaign), with the number of rounds in which full FleetServe is higher. Bursty robot arrivals use the full measurement window.
  • Phases, N=15
    FS
    96.49
    No interference model
    +24.29 (3)
    Strict gating
    +7.73 (3)
    No arrival- aware adm.
    -0.40 (2)
    Entry-only admission
    +4.87 (3)
    Zero-slack promotion
    +0.27 (1)
  • Phases, N=16
    FS
    95.57
    No interference model
    +45.74 (3)
    Strict gating
    +11.16 (3)
    No arrival- aware adm.
    +5.02 (3)
    Entry-only admission
    +15.97 (3)
    Zero-slack promotion
    +0.19 (1)
  • Phases, N=18
    FS
    95.96
    No interference model
    +45.47 (3)
    Strict gating
    +21.34 (3)
    No arrival- aware adm.
    +11.31 (3)
    Entry-only admission
    +12.13 (3)
    Zero-slack promotion
    +1.04 (3)
  • Phases, N=20
    FS
    94.23
    No interference model
    +45.68 (3)
    Strict gating
    +30.49 (3)
    No arrival- aware adm.
    +13.80 (3)
    Entry-only admission
    +11.07 (3)
    Zero-slack promotion
    -0.29 (1)
  • Bursty arrivals
    FS
    98.28
    No interference model
    +9.92 (3)
    Strict gating
    +7.54 (3)
    No arrival- aware adm.
    +0.58 (2)
    Entry-only admission
    +0.71 (2)
    Zero-slack promotion
    +2.26 (3)
  • Multiple budgets
    FS
    96.01
    No interference model
    +14.24 (3)
    Strict gating
    +22.29 (3)
    No arrival- aware adm.
    +1.47 (2)
    Entry-only admission
    +5.64 (3)
    Zero-slack promotion
    -0.25 (2)
  • Parcel, N=16
    FS
    94.78
    No interference model
    +56.62 (3)
    Strict gating
    +18.55 (3)
    No arrival- aware adm.
    +16.97 (3)
    Entry-only admission
    +13.77 (3)
    Zero-slack promotion
    -0.77 (1)
  • Parcel, N=18
    FS
    88.77
    No interference model
    +51.44 (3)
    Strict gating
    +29.90 (3)
    No arrival- aware adm.
    +18.05 (3)
    Entry-only admission
    +11.12 (3)
    Zero-slack promotion
    +2.01 (2)
Arrival-aware admission.

A separate experiment isolates arrival-aware admission in six matched rounds with rotated policy order and identical model instances, stage computations, and execution resources. These rounds are not pooled with the component campaigns. Table 9 retains both attainment and the latency and goodput effects: protecting tight-budget requests can increase wider-budget latency and need not increase goodput.

Table 9: Arrival-aware GPU ablation, six-round means. Each cell gives U / T: FleetServe without / with arrival-aware admission under matched execution resources. Tight budgets are 90\,\mathrm{ms} for alternating phases and bursty arrivals, and 80\,\mathrm{ms} for multiple budgets. Wide-budget latency is for the 400\,\mathrm{ms} class. Bursty results use the full measurement window.
  • Phases, N=15
    Overall attainment (%)
    97.3 / 97.8
    Tight attainment (%)
    94.5 / 95.6
    Wide mean latency (ms)
    114 / 148
    Goodput (responses/s)
    80.4 / 80.4
  • Phases, N=16
    Overall attainment (%)
    89.2 / 96.6
    Tight attainment (%)
    78.3 / 93.2
    Wide mean latency (ms)
    200 / 208
    Goodput (responses/s)
    74.0 / 79.0
  • Phases, N=18
    Overall attainment (%)
    84.3 / 96.5
    Tight attainment (%)
    68.7 / 93.0
    Wide mean latency (ms)
    260 / 262
    Goodput (responses/s)
    68.7 / 78.4
  • Bursty arrivals
    Overall attainment (%)
    97.7 / 97.8
    Tight attainment (%)
    95.7 / 96.0
    Wide mean latency (ms)
    94 / 95
    Goodput (responses/s)
    66.6 / 66.5
  • Multiple budgets
    Overall attainment (%)
    94.6 / 96.1
    Tight attainment (%)
    75.0 / 81.9
    Wide mean latency (ms)
    139 / 236
    Goodput (responses/s)
    77.7 / 74.7
CPU decision cost.

On a Xeon Gold 6530, we replay queued decision states from 40–45 s of the simulation four times in chronological order, with no serving process running. For 8/15/18 robots, FleetServe’s policy update and admission check (including arrival observation) take 41/63, 52/73, and 55/77 \mus (median/P99), respectively; these are CPU policy times, not added response latency.

C.4 Scheduling Policy Comparison

Baseline configuration.

All policies share allocated execution resources and per-request stage computation. Simulation selects EDF’s smallest per-stage concurrency limits preserving the best SLO attainment under alternating task phases at 15 robots; these limits are fixed for GPU evaluation. Slack-Gate’s 40\,\mathrm{ms} threshold is selected from 20, 40, and 80\,\mathrm{ms} jointly with ViT concurrency, using the same workload and bursty arrivals. Among candidates within 1 percentage point of the best attainment, selection favors lower mean latency.

Comparison and aggregation.

Each policy uses three rounds with a fixed configuration. FIFO and Slack-Gate rotate within matched rounds; EDF and FleetServe are measured separately. Comparisons use equally weighted round means, with reused measurements counted once. Reference-load checks under unchanged configurations show mean-attainment variation of -1.02 to +1.00 percentage points. Alternating task phases use 1,200 requests per robot; measurement boundaries follow Appendix C.3. Table 11 reports per-round attainment and differences in three-round mean goodput.

ERC.

ERC is the largest tested population with at least 95% attainment in each of three rounds: FleetServe passes at 18 robots but not at 20; 19 was not measured. This criterion does not imply that every smaller population passes.

Temporal and budget aggregation.

Figure 8(d) averages attainment in 2 s request-send-time bins across rounds. Section 6.3 reports attainment over the 60–80 s and 120–140 s burst windows; Table 11 uses the full [30,210) s send window. For multiple response budgets (Figure 8(e)), overall attainment aggregates all requests within each round before averaging rounds, rather than weighting budget classes equally.

Table 10: Scheduling policy comparison under matched execution resources. SLO attainment (%) is reported as R1 / R2 / R3. The N rows use alternating task phases; bursty arrivals use the full [30,210) s send window. \Deltagoodput is the difference between three-round means (FleetServe - Slack-Gate; on-time responses/s). Table 11: Parcel handling: overall SLO attainment (%) as R1 / R2 / R3 under matched execution resources.
  • N=8
    FIFO
    74.86 / 99.96 / 99.81
    EDF
    99.86 / 99.92 / 99.99
    Slack-Gate
    99.97 / 100.00 / 99.90
    FleetServe
    99.94 / 99.91 / 99.94
    \Delta goodput (responses/s)
    -0.03
  • N=10
    FIFO
    98.94 / 97.98 / 96.17
    EDF
    99.94 / 99.92 / 99.98
    Slack-Gate
    99.98 / 99.97 / 99.96
    FleetServe
    99.90 / 98.95 / 99.93
    \Delta goodput (responses/s)
    -0.14
  • N=12
    FIFO
    99.77 / 99.75 / 99.58
    EDF
    99.66 / 98.45 / 99.70
    Slack-Gate
    99.92 / 99.86 / 99.27
    FleetServe
    99.89 / 97.99 / 99.79
    \Delta goodput (responses/s)
    +1.86
  • N=14
    FIFO
    96.30 / 96.01 / 97.49
    EDF
    91.05 / 88.72 / 96.71
    Slack-Gate
    98.86 / 99.26 / 97.93
    FleetServe
    95.82 / 98.22 / 99.48
    \Delta goodput (responses/s)
    +5.34
  • N=15
    FIFO
    81.19 / 81.36 / 82.35
    EDF
    87.00 / 90.61 / 91.35
    Slack-Gate
    95.88 / 97.28 / 95.88
    FleetServe
    96.85 / 97.14 / 99.19
    \Delta goodput (responses/s)
    +10.84
  • N=16
    FIFO
    50.14 / 49.98 / 52.38
    EDF
    92.20 / 91.23 / 88.00
    Slack-Gate
    95.69 / 95.68 / 94.77
    FleetServe
    96.12 / 96.89 / 97.59
    \Delta goodput (responses/s)
    +10.62
  • N=18
    FIFO
    49.97 / 49.99 / 50.00
    EDF
    88.92 / 89.42 / 94.05
    Slack-Gate
    89.99 / 90.33 / 93.63
    FleetServe
    96.12 / 95.56 / 97.43
    \Delta goodput (responses/s)
    +14.94
  • N=20
    FIFO
    50.01 / 49.99 / 50.02
    EDF
    85.71 / 88.87 / 91.22
    Slack-Gate
    75.28 / 75.43 / 76.99
    FleetServe
    95.93 / 93.43 / 94.90
    \Delta goodput (responses/s)
    +21.90
  • Bursty robot arrivals
    FIFO
    88.89 / 89.00 / 88.37
    EDF
    98.81 / 97.99 / 97.22
    Slack-Gate
    95.61 / 95.61 / 97.50
    FleetServe
    98.66 / 98.79 / 99.27
    \Delta goodput (responses/s)
    +4.08
  • Multiple response budgets, N=15
    FIFO
    85.49 / 86.31 / 79.02
    EDF
    94.13 / 94.80 / 96.44
    Slack-Gate
    92.16 / 92.47 / 92.79
    FleetServe
    96.61 / 95.01 / 96.58
    \Delta goodput (responses/s)
    +12.28

C.5 Parcel handling

Client budgets follow recorded contact timing during parcel picking, flipping, and passing. We use 23 validation episodes, excluding one collection site with constant gripper readings that obscure contact timing. A contact interval spans 1.0 s before to 0.5 s after any gripper switch, and overlapping intervals merge; contact covers 36–78% of each episode (64% on average). Robot i replays episode i\bmod 23 from a seeded start offset and loops it. Contact intervals carry the 90\,\mathrm{ms} budget and the remaining time the 400\,\mathrm{ms} budget. Interval durations convert to response counts at the 180\,\mathrm{ms} period, because phases advance by successful responses as in alternating task phases. Each robot sends 1,200 requests with the same staggered starts, and each of up to 20 robots replays a different episode. Tight requests make up 61–63% of each scenario, and the fraction of robots in contact varies between 20% and 100%.

FIFO and Slack-Gate are measured at 10–20 robots in three rounds; EDF comes from its separate campaign and FleetServe from a separate run, all with the protocol of Appendix C.4. Repeated runs of the same configuration differ by up to 2.9 percentage points in three-round mean at 16 and 18 robots, so comparisons across runs carry uncertainty of this size. All 941,655 requests sent in the measurement windows succeed. Table 11 reports every round.

At 16 robots, tight-budget attainment is 56.6% for EDF, 92.6% for FleetServe, and 83.8% for Slack-Gate. From 14 robots upward, FleetServe returns wide-budget responses 7–56\,\mathrm{ms} sooner than Slack-Gate and increases goodput by 4.1–9.1 requests/s.